<sup id="k0skg"><wbr id="k0skg"></wbr></sup>
<object id="k0skg"></object><acronym id="k0skg"><noscript id="k0skg"></noscript></acronym>
<sup id="k0skg"><wbr id="k0skg"></wbr></sup>
<sup id="k0skg"><wbr id="k0skg"></wbr></sup><sup id="k0skg"><wbr id="k0skg"></wbr></sup>
<tt id="k0skg"></tt>

service

11.png

Purchase raw materials according to different tree species, specifications and sizes. 

The wood shall have no woodworm, no mildew and rot as well as no darkening.


22.png

The density of stacking shall be determined in accordance with different specifications and wood moisture. 

Drying time and temperature shall be determined in accordance with different wood types and different humidity. 

Wood must not leave the drying room until they are dried to 12 degrees or below.


33.png

Raw material process :Cutting _ >Fine planning _ > Break

Raw material inspection must adopt full inspection. 

The obligatory measurement items of semi-manufactured products 

Surface : The surface shall be even and smooth, burr-free and fracture-free. 

Size :The size shall be conform to the client’s final confirmatory sample ( or drawing ) .


44.png

Painting process :Polishing _ > Primer spray _ > Polishing _ >Oil spraying 

The purchased paint must be sent to the authoritative quality inspection institution for toxicity-free test before using. 

(See Annex: Test report of Shanghai Idi- Cymical Technology Service Co., Ltd. 【ITS 】or P.R.C. Yangzhou import and export toy inspection institute ) 

Painting standard : 

Painting surface :The radiance must conform to the client’s requirement with even and smooth surface, no fading and no scratching. 

Painting color : Accurate color, the color shall conform to the client’s final confirmatory sample .and there shall be no color difference among the same batch.


55.png

Raw material process :Cutting _ >fine planning_ > break 

Raw material inspection must adopt full inspection.

The obligatory measurement items of semi-manufactured products 

Surface : The surface shall be even and smooth, burr-free and fracture-free. 

Size :The size shall conform to the client’s final confirmatory sample( or drawing ).


66.png

Finished products shall receive full inspection of quality control department.

Testing item

Surface :The surface shall be even, smooth and burr-free with firm adhesive joining and no fracture. 

Size :The size must conform to the size of the client's final confirmatory sample


77.png

Packing inspection :

Accessories: label, color box and bar code of the added materials must be consistent with the product and in accordance with the contract requirements. 

Quantity :The quantity must be consistent with the quantity of the contract.


88.png

Finished products shall receive spot checking of the factory quality control department before warehousing.


COPYRIGHT © 2017 ZHEJIANG ZONXIE ARTS & CRAFTS CO., LTD.  ICP: TECHNICAL SUPPORT: @JCSW

Top 又粗又长又大真舒服好爽,当着夫的面被夫上司玩弄,一边喂奶一边同房,久久AV喷吹AV高潮AV欧美
武冈市| 梅州市| 满洲里市| 承德县| 三门峡市| 永寿县| 友谊县| 通渭县| 东乡| 英吉沙县| 朝阳区| 亚东县| 龙门县| 上饶市| 大荔县| 德庆县| 绵竹市| 冷水江市| 威海市| 文安县| 华坪县| 宁安市| 清水县| 宁都县| 随州市| 凌源市| 泰安市| 四会市| 荔浦县| 万源市| 乳源| 涞水县| 龙泉市| 崇明县| 宜春市| 宜兴市| 黄浦区| 宁津县| 新建县| 奎屯市| 黑水县| http://www.shm123.com http://www.h5xc.com http://www.76uh.com http://www.hmq520.com http://www.9830vv.com http://www.nnzgql.com